The Quality of Drinking Water ...
- 0
The Feasibility Study for the Rehabilitation & Reconstruction of the RCC Drain along Jinnah Road from Shamsi Chowk to Main Drain, Gujranwala, commissioned by WASA Gujranwala, focuses on improving the city’s stormwater management infrastructure to prevent flooding and ensure efficient drainage during heavy rains. The project, with a consultancy cost of PKR 2.382 million and an estimated construction cost of PKR 1,398.77 million, aims to rehabilitate the deteriorated RCC drain system along one of Gujranwala’s key urban corridors. Our scope of work included conducting a comprehensive topographic survey, preparing a detailed feasibility study, developing the engineering design, and providing cost estimation and PC-1 documentation. Completed in October 2024, the project delivers a sustainable drainage solution that enhances urban resilience and improves the hydraulic efficiency of the city’s drainage network.
Client: WASA Gujranwala.
Location: Gujranwala
Project Cost: 1398 million
Project Completion: Oct 2024
Services Provided: