Description

For the Public Health Engineering Department, we delivered consultancy services for the rehabilitation of the Donga Gali water supply scheme in Murree. Our work included detailed survey and planning, redesigning the system, conducting soil investigations, creating GIS maps, and performing topographic surveys to ensure the upgraded water supply infrastructure met both technical standards and local needs.

Project Additional Info

Client: PHED – North

Location: Donga Gali, Murree

Project Cost: 826 million

Project Completion: April 2025

Services Provided: 

  • Inception Report
  • Cost Estimates including survey, design drawings, soil investigation
  • Digital maps
  • Completion report