Description

 This project was commissioned by the Public Health Engineering Department (PHED) North Gujrat Division to modernize and expand the city’s water and sanitation infrastructure. Aimed at addressing issues of inadequate drainage, water supply inefficiencies, and urban wastewater management, the project encompassed a holistic design approach to ensure sustainable service delivery and environmental protection. Our team carried out extensive topographic surveys, geotechnical investigations, and prepared inception, preliminary, and detailed engineering designs. The assignment also included cost estimation and PC-1 preparation, enabling effective implementation planning. Completed in March 2022, the project plays a vital role in improving Gujrat’s urban infrastructure, ensuring reliable water supply and efficient sewerage systems for its growing population.

Project Additional Info

Client: PHED North Gujrat Division

Location: Gujrat

Project Cost: 1436 million

Project Completion: March 2022

Services Provided: 

  • Topographic Survey
  • Inception Report
  • Geotechnical investigation
  • Preliminary Design
  • Detailed Design
  • Cost estimation / PC – 1